River Dodder Flood Alleviation Works – RDS Wall

Closed 17 Dec 2018

Opened 5 Nov 2018

Overview

Applicant: Dublin City Council, Environment and Transportation Department, Flood Projects and Water Framework Directive Division.

Location: Dodder River Wall, Opposite RDS Showgrounds, Anglesea Road, Ballsbridge, Dublin 4.

Proposal: Pursuant to the requirements of the above, notice is hereby given of the construction of a reinforced concrete flood alleviation wall directly adjacent to, and on the riverside of, the existing River Dodder embankment wall. The existing river wall will be demolished from public footpath level upwards. The public footpath will be widened 600mm to the new floodwall structure. The new floodwall will be 100mm higher than the previous structure, 185m in length and will be clad in salvaged limestone.

An Environmental Impact Assessment Screening Report has been prepared and it has been determined that an Environmental Impact Assessment is not required

Plans and particulars of the proposed developments may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy for a period of four weeks from 5/11/2018 during public opening times at the offices of Dublin City Council, Public Counter, Planning and Property Development Department, Wood Quay, Dublin 8, Monday to Friday, during the hours 9.00am to 4.30pm.

A submission or observation in relation to the proposed development, dealing with the proper planning and sustainable development of the area in which the development would be situated, may be made in writing to the Executive Manager, Planning and Property Development Department, Civic Offices, Wood Quay, Dublin 8, before 4.30pm on 17/12/2018.